Select Harvest
Vesta supplied and assisted in the installation of two dual cell unit total 12.5 MW system.
We supplied and installed the access ladders and platforms as well as Aquarius water treatment controller as ordered by the client.
The towers were installed on a concrete slab with waffle pads under the legs.
The Two cells were installed side by side with three sides open for air intake.