The drift eliminators were found to be passing excessive drift and water could be seen splashing up over the drift eliminators. This indicated an issue with the spray arm or nozzles.

Vesta Group were engaged to clean the nozzles, put the branches back and replace the one grommet if required. Vesta Group also repaired the side fibreglass panel which is broken in some places.

The tower was tested by our team at the completion of the works and they have had no issues following our repairs. These repairs were temporary to keep the tower running until the spray branches are due for complete replacement.